MapEmpty
NorthCentralSouth
-
22
Eastbound from Country Club Rd. to I-287 (4.4 mi.):05 -
22
Eastbound from N. Gaston Ave. to US 1&9 (25.1 mi.):39 -
22
Eastbound from North Dr. to GSP (10.0 mi.):16 -
22
Westbound from Glenside Ave. to I-287 (12.1 mi.):17 -
22
Westbound from NJ 28 to CR 523 (6.5 mi.):08 -
22
Westbound N. Gaston Ave. to CR 523 (10.3 mi.):13
NorthCentralSouth
-
As of 2:46pm, there's a Downed tree on NJ 38 eastbound CR 641/Lumberton-Hainsport Rd in Hainesport Twp. Ramp lane closed.
-
As of 3:29pm, there's a Crash and an Overturned vehicle on the New Jersey Turnpike - Western Spur southbound North of Southern Mixing Bowl in Newark. All lanes blocked - western spur ramp to outer roadway - traffic diverted to inner roadway.
-
As of 3:06pm, there's a Watermain break on NJ 41 southbound South of CR 626/Chapel Av in Cherry Hill Twp. 1 left lane of 3 lanes closed.
-
As of 3:05pm, there's Police department activity on the Garden State Parkway northbound South of Exit 127 - US 9/I-287/NJ 440 in Woodbridge Twp. Right shoulder blocked.
-
As of 2:35pm, there's a Crash investigation on I-80 westbound West of Exit 42 - US 202/Littleton Rd in Parsippany-Troy Hills Twp. 3 right lanes of 5 lanes, right shoulder closed.
-
As of 2:18pm, there are Downed wires on NJ 27 in both directions CR 529/Plainfield Av in Edison Twp. All lanes closed.
-
As of 3:34pm, there are Delays on NJ 24 eastbound from West of Exit 8 - Summit Ave/NJ 124 in Millburn Twp to West of I-78 in Springfield Twp. All lanes open.
-
As of 3:33pm, there are Delays on the New Jersey Turnpike - Western Spur southbound from North of Interchange 16W - NJ 3 in East Rutherford to North of Southern Mixing Bowl in Newark. All lanes open 7 mile delay, due to volume.
-
As of 3:26pm, there are Delays at the Lincoln Tunnel south tunnel eastbound mid tunnel in Weehawken Twp. All lanes open The travel time is 20 minutes from New Jersey Turnpike Exit 16E to the New York side.
-
As of 3:22pm, there are Delays at the Holland Tunnel north tunnel westbound New York Side in New York. All lanes open The travel time from the New York side is 15 minutes to New Jersey Turnpike Exit 14C and 15 minutes to New Jersey 139 at Tonnelle Circle.
-
As of 3:21pm, there are Delays on the Garden State Parkway northbound exiting at Exit 127 - US 9/I-287/NJ 440 in Woodbridge Twp.
-
As of 3:14pm, there are Delays on I-295 southbound from Exit 29 - US 30 in Barrington to Exit 26N - I-76/I-676 in Bellmawr. All lanes open.
-
As of 3:10pm, there are Delays on the George Washington Bridge upper level eastbound. All lanes open The travel time is 20 minutes on I-95 from I-80 to the Alexander Hamilton Bridge.
-
As of 3:03pm, there are Delays on I-76 eastbound from Walt Whitman Bridge [-1] in Gloucester City to Exit 1A - NJ 42/I-295 in Bellmawr. All lanes open.
-
As of 2:36pm, there are Delays on the Garden State Parkway northbound from South of Exit 147 - Clinton Ave in East Orange to South of Exit 151 - Watchung St in Bloomfield 4 mile delay.
-
As of 2:03pm, there are Delays on the Garden State Parkway southbound exiting at Exit 130B-A - US 1 in Woodbridge Twp.
-
As of 2:02pm, there are Delays on US 46 westbound from East of CR 654/Cherry Hill Rd in Parsippany-Troy Hills Twp to CR 618/Mountain Lakes Blvd in Mountain Lakes. All lanes open.
-
As of 3:26pm, there's Emergency maintenance on NJ 42 northbound South of Exit 10B - CR 681/Lower Landing Rd in Gloucester Twp. Ramp lane closed.
-
As of 10:04am, there's Construction on the George Washington Bridge upper level eastbound ramp to Exit 1A - Henry Hudson Parkway in New York. 1 Right lane closed until 4:30 PM.
-
As of 9:56am, there's Construction on the George Washington Bridge upper level eastbound from New Jersey Side in Fort Lee to New York Side in New York. 1 Right lane closed until 4:30 PM.
-
As of 9:00am, there's Construction on NJ 27 in both directions from North of CR 612/West Jersey St to CR 614/Pearl St in Elizabeth. 1 right lane of 2 lanes closed until 4:00 PM.
-
As of 9:00am, there's Construction on NJ 31 northbound from North of I-295 to CR 546/Washington Crossing Pennington Rd in Hopewell Twp. 1 right lane of 2 lanes, right shoulder closed until 3:00 PM on August 01,2025.
-
As of 9:00am, there's Construction on US 130 northbound CR 522/Ridge Rd in South Brunswick Twp. 1 right lane of 2 lanes closed until 5:00 PM.
-
As of 8:58am, there's Construction on Atlantic City-Brigantine Connector southbound between Exit D - Huron Ave and North of Bacharach Blvd/Convention Center in Atlantic City. 1 Left lane and shoulder closed until 4:00 PM, MOVE OVER FOR HIGHWAY WORKERS.
-
As of 8:53am, there's Roadwork on the New Jersey Turnpike inner roadway southbound Entrance ramp Thomas Edison Service Area in Woodbridge Twp. All lanes open - entrance ramp closed to traffic, until 4:00 P.M.
-
As of 8:42am, there's Roadwork on the New Jersey Turnpike outer roadway southbound at Interchange 11 - Garden State Parkway in Woodbridge Twp. 1 ramp closed.
-
As of 8:00am, there's Construction on NJ 35 in both directions from North of CR 629/Ortley Av in Toms River Twp to South of CR 8/Washington Ave in Lavallette. 1 right lane of 2 lanes closed until 4:00 PM.
-
As of 8:00am, there's Construction on US 9 northbound between North of CR 571/Indian Head Rd in Toms River Twp and North of NJ 88 in Lakewood Twp. Right shoulder closed until 4:00 PM.
-
As of 8:00am, there's Construction on US 9 in both directions from North of CR 571/Indian Head Rd in Toms River Twp to North of NJ 88 in Lakewood Twp. 1 right lane of 2 lanes closed until 4:00 PM.
-
As of 7:00am, there's Construction on NJ 3 westbound between Hackensack River Bridge in Secaucus and New Jersey Turnpike - Western Spur in East Rutherford. Right shoulder closed until 5:00 PM.
-
As of 7:00am, there's Construction on NJ 120/Paterson Plank Road southbound between CR 503 and NJ 3 in East Rutherford. Right shoulder closed until 5:00 PM.
-
As of 7:00am, there's Construction on NJ 42 southbound between North of CR 651/Greentree Rd in Washington Twp and South of CR 689/Cross Keys Berlin Rd in Monroe Twp. Right shoulder closed until 4:00 PM.
-
As of 7:00am, there's Construction on NJ 3 eastbound between New Jersey Turnpike - Western Spur in East Rutherford and Hackensack River Bridge in Secaucus. Right shoulder closed until 5:00 PM.
-
As of 7:00am, there's Construction on NJ 52 southbound 9th St/Palen St in Ocean City. 1 right lane of 2 lanes, right shoulder closed until 5:00 PM.
-
As of 7:00am, there's Construction on I-295 southbound in the vicinity of Exit 2 - New Jersey Turnpike/NJ 140 in Carneys Point Twp. Left shoulder closed until 4:00 PM.
-
As of 7:00am, there's Construction on NJ 168 northbound CR 534/Church St in Gloucester Twp. Right shoulder closed until 4:00 PM.
-
As of 7:00am, there's Construction on NJ 70 eastbound from CR 673/Springdale Rd in Cherry Hill Twp to West of Cropwell Rd in Evesham Twp. 1 right lane of 2 lanes closed until 3:00 PM.
-
As of 6:30am, there's Construction on NJ 7 in both directions from CR 672/Mill St to Greylock Pkwy in Belleville Twp. 1 left lane of 4 lanes closed northbound; 1 right lane of 4 lanes closed southbound until 4:00 PM.
-
As of 6:00am, there's Construction on NJ 66 in both directions CR 16/Asbury Av in Neptune Twp. Right shoulder closed until 5:00 PM.
-
As of 6:00am, there's Construction on NJ 7 in both directions in the vicinity of Hancox Av in Belleville Twp. 1 left lane of 4 lanes closed northbound; 1 right lane of 4 lanes closed southbound until 4:00 PM.
-
As of 6:00am, there's Construction on I-295 northbound in the vicinity of Exit 11 - US 322 in Logan Twp. Left shoulder closed until 7:00 PM.
-
As of 8:01pm, there's Construction on NJ 71 in both directions Shark River Bridge in Avon-By-The-Sea. All lanes closed and detoured until 11:45 PM on September 30,2025.
-
As of 4:09pm, there's Construction on NJ 31 southbound CR 600/Wescott Dr in Raritan Twp. All lanes closed until 11:45 PM on October 31,2025.
-
As of 4:09pm, there's Construction on NJ 31 northbound South of CR 523 in Raritan Twp. All lanes closed until 11:45 PM on October 31,2025.
-
As of 4:02pm, there's Long term road construction on US 1&9/Tonnelle Avenue in both directions South of NJ 495/NJ 3 in North Bergen Twp. All lanes shift . Due to the Amtrak Gateway ? Hudson Tunnel Project.
-
As of 2:32pm, there's Construction on the Atlantic City Expressway eastbound in the vicinity of Exit 9 - Atlantic City International Airport -CR 563 in Egg Harbor Twp. 1 Left lane and shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 6:17pm, there's Construction on the George Washington Bridge upper level westbound ramp from West 179th Street in New York. All lanes open until 11:59 PM on December 30,2025 Trucks wider than 10 ft or longer than 110 ft are prohibited.
-
As of 8:00pm, there's Construction on US 130 in both directions from North of NJ 33 in East Windsor Twp to CR 614/Dey Rd in South Brunswick Twp. 1 right lane of 2 lanes closed until 6:00 AM on August 02,2025.
-
As of 7:00am, there's Construction on NJ 47 in both directions from South of US 322/CR 641/High St in Glassboro to NJ 41/Hurfville Rd in Deptford Twp. 1 right lane of 2 lanes closed until 3:30 PM on July 25,2025.
-
As of 12:26pm, there's Construction on Inner Port Street in both directions between Corbin Street and Port Street in Newark. All lanes closed until September 2025.
-
As of 9:05am, there's Construction on Van Wyck Expressway northbound ramp to North Service Road in New York. All lanes closed until 11:59 PM on September 03,2025.
-
As of 8:59am, there's Construction on the Atlantic City Expressway eastbound in the vicinity of Exit 38 - CR 536 in Winslow Twp. Left shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 6:55am, there's Roadwork on the Atlantic City Expressway eastbound in the vicinity of Pleasantville Toll Plaza in Pleasantville. Right lane and shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 4:01am, there's Construction on NJ 70 in both directions between East of Cropwell Rd in Evesham Twp and NJ 38 in Pennsauken Twp. All lanes shift until 11:00 P.M.on November 30th, 2025.
-
As of 4:01am, there's Construction on US 130 in both directions from CR 551 in Brooklawn to North of NJ 45 in Westville. All lanes shift until 11:59 PM on July 31, 2025.
-
As of 4:00am, there's Construction on NJ 47 in both directions from CR 551/Broadway Av to US 130 in Westville. 1 Right lane closed until 11:59 PM on December 31,2025.
-
As of 4:00am, there's Construction on NJ 70 westbound CR 539/CR 530/Whiting New Egypt Rd in Manchester Twp. 1 Right lane closed until 5:00 AM on October 10,2025.
-
As of 7:47am, there's Construction on the Atlantic City Expressway eastbound from East of Exit 7 - Garden State Pkwy in Egg Harbor Twp to West of Exit 5 - US 9 in Pleasantville. 1 Right lane and shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 7:43am, there's Construction on the Atlantic City Expressway eastbound in the vicinity of Exit 14 - Leipzig Ave in Hamilton Twp. 1 Left lane and shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 7:40am, there's Construction on the Atlantic City Expressway westbound in the vicinity of Exit 5 - US 9 in Pleasantville. 1 Right lane and shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 7:30am, there's Construction on the Atlantic City Expressway eastbound in the vicinity of Exit 41 - CR 689 - Berlin - Crosskeys Rd in Winslow Twp. Left shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 8:57am, there's Construction on Port Street eastbound ramp to Corbin Street in Newark. All lanes closed and detoured All EB Port St. access to SB Corbin St. to follow the posted Marlin St. detour until September 2025.
-
As of 6:08pm, there's Long term road construction on the New Jersey Turnpike - Eastern Spur southbound from South of Northern Mixing Bowl in Ridgefield to North of Interchange 17E - NJ 3/Lincoln Tunnel in Secaucus. 1 Right lane shift.
-
As of 10:18am, there's Construction on Corbin Street in both directions from Kellogg Street to Outer Port Street in Newark. 1 Right lane closed until September 2025.
-
As of 10:10am, there's Construction on the Atlantic City Expressway eastbound in the vicinity of Egg Harbor Toll Plaza in Hamilton Twp. Right shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 12:02pm, there's Construction on I-80 eastbound in the vicinity of Exit 56 - Squirrelwood Rd in Woodland Park. All lanes closed **Exit 56B Ramp only**, until 3:00 PM on November 18, 2025.
-
As of 12:37pm, there's Construction on the Atlantic City Expressway westbound in the vicinity of Exit 12A - US 40 - Wrangleboro Rd in Hamilton Twp. 1 Right lane and shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
Current Parking Lot Status*
*Handicapped and reserved spaces are available for those with valid permits. Parking information is subject to change at any time.
-
Northeast CorridorOn Time
-
Travel Alerts
-
Service Advisories
Jul 21 2025 1:35PMNJ TRANSIT Offers Rail Service between Secaucus Junction & MetLife Stadium for Premier League Summer SeriesJul 18 2025 3:15PMNortheast Corridor: Amtrak Switch Replacement Work – Effective Friday, July 18 to Wednesday, July 23, 2025 -
Station Advisories
Jul 22 2025 12:03PMUPDATE: Elizabeth Station: Westbound #4 Elevator Returned to Service - Effective ImmediatelyJul 22 2025 7:06AMUPDATE: Newark Penn Station: Tracks 3 & 4 Passenger Elevator No. 41 Returned to Service - Effective ImmediatelyJul 22 2025 7:05AMNew Brunswick Station: Eastbound Elevator Temporarily Out of Service - Effective ImmediatelyJul 22 2025 12:02AMUPDATE: Trenton Transit Center: Tracks 1-2 Elevator No. 3 Returned to Service - Effective ImmediatelyJul 11 2025 1:40PMMetropark Station: Platform Repair – Beginning Monday, July 14, 2025Jul 2 2025 3:03PMMetropark Station: Eastbound Elevator Temporarily Out of Service - Effective ImmediatelyJul 2 2025 2:30PMMetropark Station: Sidewalk Construction – Effective ImmediatelyJun 25 2025 8:09AMElizabeth Station: Eastbound #1 Elevator Temporarily Out of Service - Effective ImmediatelyMay 13 2025 9:26AMMetropark Station: Construction Activity & Sidewalk Closure – Effective Monday, May 19, 2025Jun 24 2024 4:55PMMetropark Station: Construction Activity Resulting in Changed Traffic Patterns – Effective ImmediatelyOct 6 2023 7:26AMSecaucus Junction: Track 2 Partial Eastbound Platform Closure - Effective October 5, 2023Jun 9 2023 12:40PMNorth Elizabeth Station: Eastbound & Westbound Partial Platform Closure - Effective Immediately
-
-
North Jersey CoastOn Time
-
Travel Alerts
-
Service Advisories
-
Station Advisories
Jul 22 2025 12:03PMUPDATE: Elizabeth Station: Westbound #4 Elevator Returned to Service - Effective ImmediatelyJul 22 2025 7:06AMUPDATE: Newark Penn Station: Tracks 3 & 4 Passenger Elevator No. 41 Returned to Service - Effective ImmediatelyJun 25 2025 8:09AMElizabeth Station: Eastbound #1 Elevator Temporarily Out of Service - Effective ImmediatelyMay 7 2025 10:56AMPerth Amboy Station: Station Enhancement Project Update - Effective Monday, May 12, 2025Oct 6 2023 7:26AMSecaucus Junction: Track 2 Partial Eastbound Platform Closure - Effective October 5, 2023
-
-
Raritan ValleyView Alerts
-
Travel Alerts
-
Service Advisories
-
Station Advisories
Jul 22 2025 7:06AMUPDATE: Newark Penn Station: Tracks 3 & 4 Passenger Elevator No. 41 Returned to Service - Effective ImmediatelyJul 21 2025 10:46AMRaritan Station: Long-Term ADA Ramp Repair – Effective Immediately
-
-
Morris & EssexView Alerts
-
Travel Alerts
-
Service Advisories
Jul 21 2025 1:35PMNJ TRANSIT Offers Rail Service between Secaucus Junction & MetLife Stadium for Premier League Summer Series -
Station Advisories
Jul 18 2025 5:19PMEast Orange: Westbound Elevator Temporarily Out of Service - Effective ImmediatelyJul 17 2025 3:14PMEast Orange Station: Eastbound Elevator Temporarily Out of Service - Effective ImmediatelyJun 19 2025 4:11PMHoboken Terminal: Construction Activity Resulting in Changed Traffic Patterns – Effective Monday, June 23, 2025Jun 18 2025 3:34PMMaplewood Station: Partial Parking Lot Closure – Monday, August 11, 2025
-
-
Main/Bergen/Port JervisOn Time
-
Travel Alerts
-
Service Advisories
-
Station Advisories
Jun 23 2025 6:56PMRamsey Route 17 Station: Westbound Elevator Temporarily Out of Service - Effective ImmediatelyMar 25 2024 11:16AMMahwah Station: Temporary Parking Updates - Effective Monday, April 1, 2024
-
-
Montclair-BoontonOn Time
-
Travel Alerts
-
Service Advisories
-
Station Advisories
-
-
Pascack ValleyOn Time
-
Travel Alerts
-
Service Advisories
-
Station Advisories
-
-
Atlantic CityOn Time
-
Travel Alerts
-
Service Advisories
-
Station Advisories
Oct 24 2023 8:58AMLindenwold Station: Waiting Room Closed - Effective Immediately
-
*NJ TRANSIT updates Travel Alerts 6 AM - 10 PM on weekdays and 10 AM - 7 PM on weekends.